top of page
Search

5/2/2025

  • jesse4430
  • May 2, 2025
  • 1 min read

VILAS COUNTY — Vilas County's summer ATV/UTV trails will be opened as of 8am this morning.  The Vilas County Summer ATV/UTV Trail System consists of 39.5 miles of trails, 12.7 miles of routes, and many more road route miles. All County highways, the lettered highways, are open for ATV/UTV travel except in the Town of Lac du Flambeau.  Numbered highways are not open for use.

 
 
 

Recent Posts

See All
EXTREME COLD WARNING

...EXTREME COLD WARNING REMAINS IN EFFECT UNTIL 10 AM EST /9 AM CST/ SATURDAY...Dangerously cold wind chills as low as 35 below expected this afternoon through Saturday morning.  Some improvement earl

 
 
 
1/23/2026

WAKEFIELD- Multiple fire crews are on scene fighting a massive apartment building fire in downtown Wakefield this morning.  The call to fire crews came in during the overnight in air temperature of 25

 
 
 
1/23/2026

GOGEBIC COUNTY - The Upper Peninsula Substance Enforcement Team says an Ontonagon County man has been arrested on drug charges in Eastern Gogebic County.  UPSET says 50-year-old Justin Diem, transport

 
 
 

Comments


bottom of page