top of page
Search

5/30/2024

  • jesse4430
  • May 30, 2024
  • 1 min read

ASHLAND COUNTY - A public hearing on Enbridge’s Line 5 pipeline will be held on June 4th. The U.S. Army Corps of Engineers has submitted a draft proposal regarding the pipeline, its safety and where it crosses the Bad River Tribe Reservation. The Bad River tribe has filed a federal lawsuit to make Enbridge remove the segment of Line 5 that runs through tribal land. The reroute proposed by the Corps replaces approximately 20 miles of the existing Line 5 pipeline with 41 miles of a new segment located entirely outside the boundaries of the reservation. Tribal elders say the route is still located near the reservation and therefore would continue to present a hazard to treaty-protected resources.

 
 
 

Recent Posts

See All
4/28/2026

MINOCQUA - Minocqua Brewing Company, and its owner Kirk Bangstad, receiving rather large backlash from both Republicans and Democrats over a Facebook post he made on Saturday following the attempted a

 
 
 
4/28/2026

ASHLAND - Ashland-based Bretting Manufacturing will be honored next month as one of six businesses at the Entrepreneur Fund’s 2026 Distinction Awards. The Ashland Daily Press reports there will be a c

 
 
 
4/28/2026

WATERSMEET, MI — The Lac Vieux Desert (LVD) Band of Lake Superior Chippewa Indians and the Lac Vieux Desert Health Center (LVDHC) announcing the opening of its $6 million 10,000 square foot Legacy Wel

 
 
 

Comments


bottom of page