11/16/2026
IRON COUNTY - One month after Wisconsin's DNR issued Enbridge a notice of violation over its Line 5 reroute, cleanup continues at the August 25 Saxon spill in Iron County, where 1.3 million gallons of natural gas liquids were released. Enbridge reports removing more than 4,200 tons of contaminated soil, including soil containing cancer-causing benzene. The DNR also cited more than 30 violations, including construction of an unpermitted pipeline bypass. Meanwhile, water continues flowing from a borehole beneath the Marengo River in Ashland County, where an aquifer breach is suspected but not confirmed. The DNR is considering enforcement options. Tribal groups are calling for Enbridge's permits to be revoked.


Comments